| Dallas Contracting Co. Inc. (Dallas Contracting) was | | | | PC300-5 mounted with a grapple (also used with a |
| contracted by a developer to dismantle a section of | | | | shear attachment), a Fiat wheel loader and several |
| a former high school as part of a larger | | | | Cat 236 skid steers. The site crew had an average |
| redevelopment of the site. The demolition scope of | | | | composition of 8 employees. |
| work consisted of the following: | | | | Debris was carefully separated from recyclable |
| - Demolition and removal of a three-story section of | | | | materials and shipped offsite for disposal. Concrete, |
| the former high school with a foot print of 23,000 | | | | masonry and brick were set aside for onsite crushing. |
| square feet and a total of 60,000 square feet building | | | | Steel and metals were sent offsite for scrap metal |
| space | | | | recycling. |
| - This section was severed from the 37,000 S.F. of | | | | Concrete, brick, masonry and asphalt were crushed |
| building which remained | | | | onsite into 1 ½ inch or smaller material using an |
| - Removed partition at the first floor to create new | | | | Eagle Crusher Company, Inc. UltraMax 1000-15CV |
| storage room | | | | Plant with stacking conveyors. Dallas Contracting has |
| - Removed the raised concrete floor at the rear of | | | | owned this unit for over four year and was |
| the auditorium to create a new studio at the second | | | | extremely pleased with its production on this project. |
| floor | | | | Daily crushed material production was 1000 tons +. |
| - Removed mezzanine at the third floor to create | | | | Crushed concrete, brick and masonry were stockpiled |
| new studio | | | | separately from crushed asphalt materials. The |
| - Removed three floors of staircase for new | | | | crushed materials will be reused onsite by the |
| elevator | | | | developer for backfilling purposes. |
| - Removed partitions as shown for new classrooms | | | | The project was completed in approximately three |
| at the third floor | | | | (3) months with no incidents or injuries. |
| - Removed partitions as shown for art store at the | | | | About Dallas Contracting Co., Inc. |
| first floor | | | | Dallas Contracting Co., Inc. is a demolition and |
| - Removed all concrete floor and footings | | | | concrete crushing contractor based in New Jersey. |
| - Crushed all concrete and masonry to be used as | | | | We have been in business for over 25 years, are |
| backfill for basement approximately 1,700 C.Y. | | | | financially sound (D&B Rating of 3A2, and are |
| - Removed all debris from site | | | | bondable. Our work is completed professionally and |
| Employees with demolition saws and hand tools using | | | | with an OSHA trained workforce. We provide the |
| scissor lifts carefully separated the building to be | | | | following services: Demolition, Building Demolition, |
| demolished from the structure that was to remain. | | | | Onsite / Mobile Concrete Crushing, Brownfield |
| Equipment utilized to complete the demolition included | | | | Redevelopment, Surplus Equipment Sales, Interior |
| a Komatsu PC-400 mounted with a concrete | | | | Demolition, Equipment Removals and Wrecking. |
| pulverizer jaw attachment (this was also used at | | | | Contact Information: |
| times with a Labounty straight shear), a Komatsu | | | | Dallas Contracting Co., Inc. |